Watershed

Upper East Fork Whitewater River Watershed Study

In 2023, the Wayne County SWCD launched efforts to protect and improve the Upper East Fork of the Whitewater River and its 138,686-acre drainage.

The Upper East Fork Whitewater River Watershed drains portions of Randolph, Union and Wayne Counties, Indiana and Darke and Preble Counties, Ohio.

About the Upper East Fork Whitewater River Watershed

Land within the Upper East Fork Whitewater River Watershed is predominantly in agricultural row crop or pastureland (62%) with an additional 20% in forest and wetland land uses and 17% in urban land uses. A majority watershed soils are very limited for septic use.

What is a watershed?

The Upper East Fork Whitewater River Project focuses on protecting and improving water quality in the Upper East Fork Whitewater River Watershed. All of the land from which water drains into a singular waterbody – in this case this reach of the East Fork Whitewater and forms a watershed. These drainage boundaries are determined by land elevation rather than state or county lines, political boundaries, or residential property lines.

Click Here for a google map of the watershed. The different colors represent the different Hydrological Unit Codes (HUCs) associated with the project. This study includes 10 HUCs upstream from Brownsville, IN.

The Upper East Fork Whitewater River Project

This phase of the Upper East Fork Whitewater River Project includes three main goals:

  1. Assess Water Quality: The Upper East Fork Whitewater River Project in partnership with the Richmond Sanitary District and Earlham College will assess water chemistry, fish and bug communities and available habitat across the Basin. Chemistry samples will be collected throughout the year (May 2025 to April 2026) while biological and habitat assessments will occur in the Summer of 2025.
  2. Watershed Management Plan: The Upper East Fork Whitewater River Project will connect stakeholder concerns with water quality and computer generated data to develop a step-wise plan for protecting and improving Upper East Fork Whitewater River, its landscape and its water quality. The planning process will include regularly-schedule steering committee meetings with draft plans posted here.
  3. Education and outreach: The Upper East Fork Whitewater River Project will engage youth and adults through workshops and field days, community events, monitoring water quality and more.

 

Links of Interest:

Past watershed project documents:

Join the Upper East Fork Whitewater River Project!

Upcoming Meetings/Events:

Steering Committee Meeting – August 18th – 10am – Wayne County Council Chambers – Wayne County Annex Building

  • Agenda –
    • Review inventory and determine
      • Do we need any additional data/did we miss anything
      • Should any of these items be added to our concerns list?
    • 2002 Middle Fork (of the East Fork) Whitewater WMP concerns list review
    • Inventory options
    • Upcoming education and outreach events
  • Inventory/Meeting Slides

Hoosier Riverwatch Workshop – October 3rd – 10a-4p – Earlham College – Limited seating, please register HERE

Steering Committee Meeting – November 13th – 10am – Wayne County Council Chambers – Wayne County Annex Building

The sampling team recently conducted a fish study and a few community members joined in. Another sampling will take place in the coming weeks with more pictures to come!

Scroll to Top